17 · Architecture

One sheet per plant. None of them is a permit.

AURION POWER, STAR KEY Energy PLC. These are floor plans for a credit discussion: what building each project needs, and which project does not belong on the 150 ha pin. They are not a survey, not an IFC set, and not a drawing an Ethiopian-registered architect has stamped.

Site

The lease rectangle is the sponsor’s 150 ha, unsurveyed. CSP sits outside it on purpose.

150 ha sponsor leaseBoundary, title and grazing corridors are unsignedPV inquiry50 MWac may already fill this parcelWell padscount open5 ha greenhousePhase 1 onlyBuildings + roadcontrol, water, substationPastoral corridorwidth unknown — do not erase200 MW CSPdoes not fit · separate projectNo CSP geometryis drawn insidethe lease.lease extent — not measuredNSite — lease screen, not a layoutAURION POWER · STAR KEY Energy PLC · Afar · conceptual basis of designNOT FOR CONSTRUCTION · NOT A PERMIT DRAWING · 8 Oct 2026Owner-creator: Wondmeneh BekureNTS · boundary unsurveyedGate: cadastral surveyDimensions are screening allowancesA-001

Photovoltaic building

Phase 1 power is a 50 MWac field. This sheet is one MV and inverter building. How many copies, and where the rows sit, waits on the hectares that are actually buildable.

Inverter hallbay count = vendor, not this sheetspare baysMV switchgear33 kV assumed — unconfirmedStoreFire / auxWCControl alcove35 m screening15 mOne building. A 50 MWac field needs several, plus roads at roughly 2.2–2.8 ha per MWp. Array layout is refused until the survey.NPhotovoltaic — MV / inverter buildingAURION POWER · STAR KEY Energy PLC · Afar · conceptual basis of designNOT FOR CONSTRUCTION · NOT A PERMIT DRAWING · 8 Oct 2026Owner-creator: Wondmeneh BekureScreening 1:200Phase 1 · repeat count openDimensions are screening allowancesA-101

Geothermal power house

Binary ORC. The air-cooled condenser is a yard, not a room. Nothing here is ordered before the well test.

ORC hall20 MW nameplate is a target, not a testElectricalgenerator breakerControlseparated from hallLube / chemicalWCAir-cooled condenseroutdoor · vendor plot25 m buildingACC yard openBinary cycle, not a flash plant. No steam turbine is drawn. Power block stays unbuilt until a pump test supports P90 ≥ 15 MW.NGeothermal — ORC power houseAURION POWER · STAR KEY Energy PLC · Afar · conceptual basis of designNOT FOR CONSTRUCTION · NOT A PERMIT DRAWING · 8 Oct 2026Owner-creator: Wondmeneh BekureScreening 1:250Phase 1 · after well testDimensions are screening allowancesA-201

One well pad

A single pad. The program is three to six wells. A field plan would be fiction before the first well is completed.

Pad fence · about 80 m × 50 m · liner under the working areaCellar + rigone wellMud tanksPipe rackFlare pitsetback, not next to the roadLaydownAccessfrom the Dubti roadA pad is not a resource. Three to six wells is a drilling program. The field layout waits on the first completed well.NGeothermal — one well padAURION POWER · STAR KEY Energy PLC · Afar · conceptual basis of designNOT FOR CONSTRUCTION · NOT A PERMIT DRAWING · 8 Oct 2026Owner-creator: Wondmeneh BekureScreening 1:400Phase 1 · 3 to 6 pads, not drawn as a fieldDimensions are screening allowancesA-202

Greenhouse module

One hectare, repeated five times in Phase 1. The sponsor’s 20 ha is not this drawing.

Greenhouse bayabout 96 m × 96 m · one hectareCrop bay — gutter height openHeadhousefertigationPackingColdif crop needs itOfficePhase 1 is five of these, 5 ha, not the sponsor’s 20 ha. Water and brine come from sheet A-401. No crop is specified until the water licence.NFarming — one greenhouse moduleAURION POWER · STAR KEY Energy PLC · Afar · conceptual basis of designNOT FOR CONSTRUCTION · NOT A PERMIT DRAWING · 8 Oct 2026Owner-creator: Wondmeneh BekureScreening 1:500Phase 1 · five modules = 5 haDimensions are screening allowancesA-301

Water treatment

Process rooms only. Capacity is whatever the water permit says. Brine has no disposal drawing because none exists.

Intakesource unprovenPretreatmentsand, heatRO skidcapacity = licenceCIPElectricalProducttank is outsideRejectbrine disposal unsolvedLab38 m screeningSponsor figure of 2,000 m³/day is not the design basis. Size the skid to the water permit. Reject brine is a sheet that does not close.NWater — treatment buildingAURION POWER · STAR KEY Energy PLC · Afar · conceptual basis of designNOT FOR CONSTRUCTION · NOT A PERMIT DRAWING · 8 Oct 2026Owner-creator: Wondmeneh BekureScreening 1:200Pilot until the licenceDimensions are screening allowancesA-401

Control, admin, workshop

The occupied building. Control is separated from the workshop so a weld does not sit on the SCADA wall.

Gate / lobbyControl roomSCADA wall, no glareServerseparate ACOfficesClinicMessWorkshopabout 23 m × 12 mStores + sparesmodules and wellheads do not share a bay40 m admin barAfar afternoon heat is a design load. Every occupied room is cooled. This is not a camp for construction labour — that camp is a separate, temporary permit.NControl, admin and workshopAURION POWER · STAR KEY Energy PLC · Afar · conceptual basis of designNOT FOR CONSTRUCTION · NOT A PERMIT DRAWING · 8 Oct 2026Owner-creator: Wondmeneh BekureScreening 1:200Phase 1 · occupied buildingDimensions are screening allowancesA-501

Substation

Yard plus a relay hut. Voltage is blank. No transformer is specified.

Outdoor AIS yard · kV blank until EEPLine bayquantity openTransformerrating openBus + spare baydo not omit the spareControl hutrelay roomOil / fireInterconnection voltage, fault level and a bay number are undesigned. This sheet is a checklist, not a single-line.NSubstation — yard and controlAURION POWER · STAR KEY Energy PLC · Afar · conceptual basis of designNOT FOR CONSTRUCTION · NOT A PERMIT DRAWING · 8 Oct 2026Owner-creator: Wondmeneh BekureNTS · voltage openNo order before the impact studyDimensions are screening allowancesA-601

CSP — a different project

Shown so a reader can see the power block, and so it cannot be papered onto the Tendaho lease.

Steam / TES hallonly after a measured DNI yearTurbinedry cooling mandatorySalt tanks12 h is a sponsor claimWater treatmentCSP plus farm will fightDo not issue this sheet for the Tendaho pin.Troughs at about 2–2.5 ha per MW do not fit beside Phase 1 PV. A CSP train is a second site, a second raise, and a capacity-priced PPA. No floor is coordinated with A-101.NCSP power block — other projectAURION POWER · STAR KEY Energy PLC · Afar · conceptual basis of designNOT FOR CONSTRUCTION · NOT A PERMIT DRAWING · 8 Oct 2026Owner-creator: Wondmeneh BekureNot scaled · not sitedRefused on the 150 ha leaseDimensions are screening allowancesA-701

What each sheet refuses to decide

SheetProjectStill open
A-001SiteTitle, grazing width, net buildable hectares
A-101PVInverter count, row pitch, soiling access
A-201ORC houseVendor plot, MW after the pump test
A-202Well padHow many wells, and where the second pad goes
A-301GreenhouseCrop, gutter height, cooling load
A-401WaterSource, licence volume, brine fate
A-501ControlConstruction camp is a different permit
A-601SubstationkV, fault level, bay count
A-701CSPSite, DNI year, EPC, offtake — not this parcel