15 · Infrastructure

Future infrastructure, sector by sector — and only one way to join them

Screening designs for Shared services, Markets, Jewels, Labs and AURION POWER, plus a resources envelope that is refused. Pre-feasibility screening design. Not issued for construction, not a single-line, not a plot plan.

Not issued for construction150 ha fails the 250 MW pictureNo virtual assets

Together — the only integration that is allowed

The group is not a campus and not a platform. It is three geographies, five legal boxes, and a short list of pipes. Everything else in the master registry stays on the shelf.

Lease, year 1

Addis Ababa

Holding office, Markets QC room, Jewels bench, Labs bench. One floor, not a campus.

EEU service. These businesses do not ‘run on STAR KEY’. Wheeling is a later regulated product, not a slogan.

Unsurveyed

Afar — Tendaho / sponsor pin

AURION POWER only. PV, wells, a small greenhouse, and only then an evening-storage option.

EEP interconnection. Voltage and bay are the output of a system-impact study, not a drawing in this file.

Not allocated

Industrial park / SEZ

Jewels factory option. Proclamation 1322/2024 is not a plot. No park is named because none is won.

Park utility. Do not site a refinery or a mine here on the back of a jewelry story.

Three places, not one campus

Addis does trade, metal and filings. Afar does power, and only power. A park shed for Jewels is a third place that has not been won. Drawing them as one render is how land, security and lenders get confused.

Five legal boxes

Holding, Markets, Jewels, Labs, STAR KEY. Shared services are a cost centre with a recharge, not a sixth operating company that collects everyone’s cash.

Two clocks

The holding can ship a lot and a bracelet this year. The power plant cannot pour a foundation this year. Integration means the greenhouse, if it ever produces, has a seller. It does not mean the marketplace collateralises the wells.

Data follows the SPV

Lot files, vault logs, patent drafts and SCADA history are four stores. The group sees consolidations and audit rights. Labs does not own the DNI series. Markets does not see the vault combination.

Energy does not loop

Addis buys from EEU. Afar sells to EEP under a PPA that does not exist yet. There is no private wire from Tendaho to a Bole workshop, and no wheeling product to announce.

Pipes

If a flow is not in this table, it is not part of the design.

Markets → Jewels

Sell finished, hallmarked pieces on consignment.

Markets taking title to unrefined gold, or booking bullion as GMV.

Markets → Power agri

Sell proven greenhouse lots with a phytosanitary file.

Fertilizer or crop revenue inside the Power DSCR.

Labs → Power

Soiling, met and wellhead loggers under a data licence.

Valuing that IP as collateral for STAR KEY debt.

Jewels → Resources

Nothing. Resources is not a sector.

Related-party artisanal gold, mercury, or a ‘future mine’ footnote on a Jewels invoice.

Power → Holding

Development equity down. Dividends only after lender lock-up.

Cross-default, cash sweep of marketplace receipts, or a single $1.9B cheque.

All engines → Shared services

Identity, email, a group chart of accounts, cost recharge.

One ledger, one admin password, one production database.

Fixes already in this recast

Generation

Was · 1.752 TWh booked against CFs that produce ~1.14 TWh

Now · Model uses MW × 8,760 × CF × availability. Sponsor print is shown as a print.

IRR

Was · 28.7% as a validated result

Now · Retired. Independent 250 MW screen does not clear a lender.

Capital

Was · $3.6M holding raise narrated next to a $1.86B plant

Now · Two stacks. Power construction is not the Seed.

Agri

Was · 40,000 t fertilizer inside plant revenue

Now · 5 ha lab in Phase 1. Not in DSCR.

Payments

Was · USDC as a diaspora feature

Now · Struck. NBE notices of 27 Feb 2026 and 23 July 2026.

Resources

Was · A future mine inside the group story

Now · Refused until a separate study exists. No pin, no capex.

Still open — do not tick these

  • PLC and subsidiary registers — not in the pack.
  • PPA, MoF wrap, interconnection — term-sheet language only.
  • 12-month DNI and a real layout against the 150 ha pin.
  • Pump test. The 2,000 m³/day figure is not a licence.
  • 1144/2019 certificates, export licences, EIC licence.
  • ESIA under the April 2025 proclamation. Gazette number to be confirmed (1371 vs 1317 in secondary sources).
  • Phase 1 megawatts vs hectares — unresolved on purpose.

Left on the shelf

  • Quantum SDKs, brain–computer interfaces, holographic operations rooms, and a group-wide digital twin are not in any capital stack.
  • A catalogue of industrial protocols (OPC UA, IEC 61850, Modbus, MQTT) is not a procurement list. A protocol is specified only where a named counterparty requires it.
  • Virtual-asset settlement is prohibited design. NBE’s 27 February 2026 notice barred birr-paired crypto P2P. Its 23 July 2026 notice extended the prohibition to exchange, transfer, custody and related services unless the Bank expressly authorises them.
  • One shared bank account, one database, or one cross-default across Markets, Jewels, Labs and STAR KEY.